GDN solves historic water ingress problem using latest Water Extraction System.

A UK Gas Distribution Network put an end to 88 repeat visits over 2 years by using the latest in water extraction technology for live gas mains.

A 4” main in a busy residential area was causing repeated problems for a GDN, with one particular property repeatedly going off gas due to water being drawn up through the service.

After 88 repeat visits to remove water from a syphon pot, Synthotech were called to assist with their new Water Extraction System.

The system allowed for water to be removed continuously whilst carrying out a CCTV survey along the main.  The survey located a fracture below the waterline which was subsequently repaired.

To download the full case study, click here.

Back
Wem equipment2
chat graphic
Quick Enquiry
If you have an enquiry, please fill-out the form and we will get back to you.

call me back graphic
Call me back
We would love to discuss your requirements. Click here and a member of our team will call you back.

chat graphic
Chat
Our team is here to chat online and help with any questions you may have.

knowledge base graphic
Knowledge Base
Access our videos and documents to help you stay ahead of the industry curve.