Are you ready for Winter 2016?

Synthotech’s Technical Support Engineers have been out with WExTech for Mains.

Chris Hart, one of Synthotech’s TSEs, has been down to Bow in London to help National Grid Gas Distribution with a water ingress problem. More than 20L of water was removed from a 125mm PE gas main.

If you would like more information about WExTech for mains or if you have a water ingress problem check out the WExTech range here, or contact us for more information.

Wem survey1

Chris Hart operating the WExTech Mains

Back
Wem survey 4
chat graphic
Quick Enquiry
If you have an enquiry, please fill-out the form and we will get back to you.

call me back graphic
Call me back
We would love to discuss your requirements. Click here and a member of our team will call you back.

chat graphic
Chat
Our team is here to chat online and help with any questions you may have.

knowledge base graphic
Knowledge Base
Access our videos and documents to help you stay ahead of the industry curve.